PREMILL horizontal roller mill
Reducing the clinker factor calls forth the need to increase fineness of grinding of cements.
At the same time, many existing mills reach their performance limits. Building a new grinding plant is an expensive investment with a long payback period.
PSP Engineering offers solution with its PREMILL horizontal roller mill installed before an existing ball mill.

PREMILL horizontal roller mill is an innovative, patented product installed before a ball mill for the raw material, clinker and additives pre-grinding.
Efficient grinding solution
- capacity increase 20-30%*
- energy savings 15%*
- quick payback period
- compact design
- low investment and maintenance cost
* with the ball mill and grinding circuit modification

For more information, please contact: cement@pspeng.cz

